top of page

Gold Concession of 150 Km2 in Siguiri

The firm is planning to perform all the pre-feasibility and feasibility studies. As well will be performed all the drillings and testing together with the environmental and community impact studies. This is a fully aluvial gold concession very similar to the concession of Ashanti Gold which is currently in production in the country.
The firm is working with the most renowned Canadian gold geologists and will get a detailed NI 43-101 report that will be focusing on evidencing a maximum of proven gold reserves. Siguiri together with Mandiana are the two regions with the highest gold potential in West Africa where Ashanti Gold and SEMAFO are currently developping an industrial production.
The beginning of the geological Survey is planned for October 2013 after the raining season.
 

During the 2 years of geological Survey the firm is planning to develop a small semi industrial gold production on the ground that will help determining the gold reserves but as well that will help establishing the feasibility studies for the full mining infrastructure in order to develop an industrial gold production.
 

bottom of page